Lewisham · Finished

Pool & cabana, Lewisham.

A backyard rebuilt from the lawn down: a pool cut into rock, a brick cabana, and stone paving to tie it together. Here's how it went in, phase by phase, from the dated site photos.

  • Pool excavated through rock
  • Reinforced concrete shell, fully tiled
  • Brick cabana with a covered roof
  • New paving, steps and glass fencing
Swimming pool and outdoor entertaining

From lawn to pool and cabana.

A traditional grassed backyard reworked into a contemporary pool and alfresco entertaining space. Retaining walls and landscaped levels reshape the yard, with purpose-built stairs linking the home, the pool and the entertaining areas.

The new pool is the centrepiece, beside a cabana that houses the pool equipment and a covered outdoor barbecue area, with planting around the hard landscaping to soften the built elements.

01

The dig

Breaking ground and cutting through rock.

21 Jan – 4 Feb 2022
Day 1–15

Day 1 · 21 JanThe yard, before. A sloping lawn between two boundary walls.
Day 4 · 24 JanFirst cut.
Day 4 · 24 JanRock underneath, broken out by hammer.
Day 15 · 4 FebSquared up.
02

Steel and shell

Down to depth, steel tied in, concrete shell formed.

15 Feb – 13 Apr 2022
Day 26–83

Day 26 · 15 FebDown to depth.
Day 30 · 19 FebSteel tied in.
Day 62 · 23 MarShaping the shell by hand.
Day 83 · 13 AprCured, with the steps and bench formed.
03

Steps and paving set-out

Plumbing, formwork and the steps.

20 Apr – 3 May 2022
Day 90–103

Day 90 · 20 AprPlumbing in and the paving set out.
Day 102 · 2 MaySteel and formwork for the slab and steps.
Day 103 · 3 MayThe steps formed.
04

The cabana

Brickwork, roof frame and lining.

8 Jun – 16 Jul 2022
Day 139–177

Day 139 · 8 JunBrickwork for the cabana.
Day 149 · 18 JunThe cabana roof frame goes up.
Day 162 · 1 JulRoof framed, paving going down.
Day 177 · 16 JulThe cabana takes shape.
05

The finish

Tiling, paving, fencing and water.

22 Aug – 23 Sep 2022
Day 214–246

Day 214 · 22 AugThe pool being tiled.
Day 226 · 3 SepPaving down, walls rendered.
Day 246 · 23 SepFilled, fenced and finished.
Day 246 · 23 SepReady to use.
The finished pool and glass fence, with the cabana roof on the left, in June 2024

Still looking the part.

The same yard after nearly two summers of use, photographed again in June 2024.

From site

The build, on film.

Footage from the job. Tap for sound.

Every photo, start to finish.

Your project next.

Talk to Alex

0425 221 225 · alex@medaxdev.com.au